More BOX-WIN results published

Two new reports with results of the BOX-WIN project have now been published. These Technical Reports can now be downloaded from our Downloads page.

Technical Report no. 6
“Long-time behaviour of mustard gas dumped in the Bornholm Basin”

Technical Report no. 7
“Survey of Swedish suppliers to a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”

The results presented in these reports are important for the environmental assessment and the construction of a Demonstrator in the Bornholm Basin.

Kommentera

E-postadressen publiceras inte. Obligatoriska fält är märkta *

Följande HTML-taggar och attribut är tillåtna: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>